A new kitchen with increased levels of insulation and function was required by the property’s tenants. The roof was repaired, insulated and re-felted before the original pan tiles were re-hung. The brick walls were then insulated using a special board that was then plastered and painted. A new tile floor and kitchen were fitted along with a breakfast bar and a designated recycling point.